Kimball Junction Pedestrian Bridge Survey
Summit County, Utah (Sept 29, 2026) — As part of redevelopment and transportation improvements coming to Kimball Junction, Summit County is working with the Utah Department of Transportation (UDOT) and the Arts Council of Park City and Summit County to design and install a new pedestrian bridge crossing SR-224 near Ute Boulevard.
Through October 4, residents and visitors can complete a survey and provide feedback on three design concepts, labeled “A,” “B” and “C.” These architectural renderings are illustrative, and final structural engineering requirements, building codes, and material adjustments may alter the visual outcome and dimensions.
“This bridge could stand for 75 years or more — serving the needs of millions of people,” said Carl Miller, Director of Transportation Planning for Summit County. “We want to hear from the public about what they like and what other features we can plan for to make the best version of the bridge that we can.”
Kimball Junction was designated a “Housing and Transit Reinvestment Zone” (HTRZ) by the Utah Governor’s Office of Economic Opportunity earlier this year. The HTRZ encompasses a 60-acre area centered on the transit center and, in addition to the pedestrian bridge, includes the following improvements:
- The relocation of the Summit County Library and DMV into the PEAK Center
- New civic buildings, a public plaza surrounded by mixed uses, a park, and an amphitheater.
- Dedicated senior care and medical facilities.
The need for a dedicated pedestrian crossing was identified in the Kimball Junction Environmental Impact Statement completed by UDOT in 2025, but Summit County offered to assume some additional costs in order to construct a bridge that would be a signature feature in the community. To see the design concepts and complete the survey, visit summitcounty.info/bridgesurvey.
Following the public survey, results will be shared with the arts council, and a final recommendation will go to the Summit County Council for approval.
If you would like to learn more, visit the “Taco-Bout Kimball Junction + Peek inside PEAK” event on Saturday, Oct. 3, from 11 am – 2 pm at 6301 N Landmark Dr.
Legal Disclaimer:
EIN Presswire provides this news content "as is" without warranty of any kind. We do not accept any responsibility or liability for the accuracy, content, images, videos, licenses, completeness, legality, or reliability of the information contained in this article. If you have any complaints or copyright issues related to this article, kindly contact the author above.